New Zoning Law for Koh Samui, Koh Phangan & Koh Tao – What Property Owners & Developers Need to Know (May 2025 Update)

Sukhothai Inter Law Property Lawyer koh Samui

Table of Contents

Effective 21 May 2025, Thailand’s Ministry of Natural Resources and Environment has enacted new environmental protection regulations for Surat Thani Province, including Koh Samui, Koh Phangan, Koh Tao, and surrounding islands.

Overview of the Regulations

The new law defines seven environmental protection zones:

ZoneDescriptionApplies ToRestrictions
1Marine areasAll IslandsNo pollution, marine disturbance, limited tourist zones
2Beachfront/Coastal landKoh Samui, Koh Phangan, Koh TaoHotel size limits, setback rules, wastewater treatment
3 (1)Hillside (≥80m elevation)Koh Samui, Koh Phangan, Koh TaoSingle homes only, 6m height, 50% green space, sloped roof
3 (2)High elevation (>140m)Koh Samui, Koh PhanganStricter: 90sqm footprint, 70% open space, no terrain alteration
4Smaller islands (e.g. Ko Fan)Selected islesMax building 75sqm, high green space
5Sensitive isletse.g., Ko Mae ThapConstruction prohibited except government use
6Tiny conservation isletse.g., Ko KongConstruction prohibited
7Ko Tao & Ko Nang Yuan–Construction restricted

What Does This Mean for Koh Samui and Koh Phangan?

For Villa Owners & Developers

  • Zone 3 (1): Only one single-family home per parcel, max height 6m, 50% green space, natural roof color & slope ≥80%
  • Zone 3 (2): Max 90sqm building, 70% open space (50% green), no slope alteration
  • No land subdivision, no retaining walls or resort-style developments in hillside zones

Sloped Land (Zones 2–7): ≥35% gradient land requires special permissions for grading or altering terrain or removing large trees.

For Hotel Operators & Developers

  • Projects with 10+ rooms require grease traps, wastewater treatment, proper drainage
  • Must maintain beach access, avoid shoreline encroachment
  • Must retain 50–75% green or open space
  • EIA/IEE Required for projects with:
    • 50+ guest rooms
    • Usable area ≥2,500 sqm
    • Land subdivision
    • Piers or large infrastructure

Exemptions

Structures completed before 21 May 2025 are exempt if:

  • No change of use
  • No major structural expansion or modification violating new laws
  • Existing permits remain valid until expiry

Recommended Next Steps

  1. Verify zoning and elevation (especially for hillside or steep plots)
  2. Hire qualified surveyors for slope and topography mapping
  3. Review development plans for environmental compliance
  4. Upgrade infrastructure—especially wastewater and drainage
  5. Obtain legal review before sale, purchase, or land repurposing

How We Can Help

Sukhothai Inter Law offers full legal support for developers, property owners, and operators, including:

  • Zoning and elevation checks
  • EIA/IEE preparation and submission
  • Environmental audits for existing properties
  • Legal strategy for redevelopment and approvals
  • Real estate advisory: due diligence, contracts, structuring ventures

Contact us today to schedule a compliance consultation or request a site-specific legal briefing tailored to your project.

WhatsApp
Email

Articles

Property Visa

Secure visa through a THB 3M property investment. Ensure your acquisition meets the new 2026 requirements.

Check your Eligibility